Thomas McInerney Architect -
Plum Grove Inn -
(completed May 2009)
 
 
 
Main Front Entrance (January 2007)
Main Front Entrance (January 2007)
The house is new construction. The walls are Insulated Concrete Forms with 6-inch thick concrete.
Main front entrance
Main front entrance
Before siding installation (October 2007)
South side near Fireplace
South side near Fireplace
Installation of sheathing under siding (March 2008)
Siding Installation in April 2008
Siding Installation in April 2008
We needed a lift to install the siding on the south face of the building.