Plum Grove Inn -
(completed May 2009)
Main Front Entrance (January 2007)
The house is new construction. The walls are Insulated Concrete Forms with 6-inch thick concrete.
Main front entrance
Before siding installation (October 2007)
South side near Fireplace
Installation of sheathing under siding (March 2008)
Siding Installation in April 2008
We needed a lift to install the siding on the south face of the building.